UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 5
May-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIRCS06036


Registration ID:
211837

Page Number

157-164

Share This Article


Jetir RMS

Title

Assessment of Factors Causing Delay in Construction Projects

Abstract

Construction industry is the backbone for development of any country across the globe. In all the countries, the most common problem in construction industry is deviation from a planned time schedule. The most common problem at construction sites is delays, i.e. time overrun to complete the project. There are various factors at construction sites which affect systematic flow of work resulting in time overruns. Delays may be site dependent and vary in severity for different project activities. However, one can find out ways to minimize such delay by identifying the causes and effects of delays. This paper focuses on finding out the most important factors causing delays in construction project by conducting a questionnaire survey with the various contractors, clients and consultants. By random sampling technique the questionnaire survey concluded that there are 38 major causes of delay and 6 effects of delays are prominent. Out of which the top 10 causes of delays have been shortlisted with respect to Mumbai construction industry and to avoid delays in construction projects certain remedies are suggested. The second objective of the paper is to specifically study the causes of delays on site and its effects on the project using MSP i.e. Microsoft Project, delays of sub activities are measured. The assigning of resources educate about the project in terms of cost. Furthermore the rank of each delay factor is assigned through the questionnaire survey and the actual data collected on site through pergola task. The spearman rank co relation has been used to compare the parameters to find out whether the delay factors are dependent or independent of each other.

Key Words

Causes of Delay, Effects of Delays, Mumbai, and Construction Projects, MSP.

Cite This Article

"Assessment of Factors Causing Delay in Construction Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 5, page no.157-164, May 2019, Available :http://www.jetir.org/papers/JETIRCS06036.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Assessment of Factors Causing Delay in Construction Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 5, page no. pp157-164, May 2019, Available at : http://www.jetir.org/papers/JETIRCS06036.pdf

Publication Details

Published Paper ID: JETIRCS06036
Registration ID: 211837
Published In: Volume 6 | Issue 5 | Year May-2019
DOI (Digital Object Identifier):
Page No: 157-164
Country: -, --, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0003018

Print This Page

Current Call For Paper

Jetir RMS