UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 3 | March 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 5
May-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2105133


Registration ID:
308905

Page Number

a30-a35

Share This Article


Jetir RMS

Title

“Estimating, Costing And Scheduling On Microsoft Project”

Abstract

This study's main goal is to create a tutoring assistant who can assist discrete civil engineering students in their practice by analyzing problem statements and providing appropriate feedback when they get stuck. The aim of this paper is to create an overview of estimating and scheduling for a multi-story building, with the inputs being a collection of randomly created exercises in MS Project format, and the output of my method being these problems being a scheduled estimation of a building properly controlled with how much cost will be needed for the basic construction work in a brief manner. A dilemma generator is used by the tutoring assistant to assess the students' skills. There are two stages to evaluating a response. The first step is to create the required 2D drawings of the building in a detailed plan view. The second step is to use Microsoft Project software to create a scheduled plan for the building's construction phase, in which the projected time and basic construction cost are assessed. All of the inputs were presumed and reflected in the drawings, and the project's projected time and expense were measured. The detailed estimation of the project was not completed due to a shortage of funding due to unforeseen circumstances. As a result, the project's budgeted expense isn't as accurate as it should be because certain resources aren't factored in.

Key Words

Quantity surveying, Network Diagram, Timeline of project

Cite This Article

"“Estimating, Costing And Scheduling On Microsoft Project”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 5, page no.a30-a35, May-2021, Available :http://www.jetir.org/papers/JETIR2105133.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"“Estimating, Costing And Scheduling On Microsoft Project”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 5, page no. ppa30-a35, May-2021, Available at : http://www.jetir.org/papers/JETIR2105133.pdf

Publication Details

Published Paper ID: JETIR2105133
Registration ID: 308905
Published In: Volume 8 | Issue 5 | Year May-2021
DOI (Digital Object Identifier):
Page No: a30-a35
Country: Katihar, Bihar, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000534

Print This Page

Current Call For Paper

Jetir RMS