UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 5
May-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2105770


Registration ID:
309919

Page Number

f783-f789

Share This Article


Jetir RMS

Title

OPTIMIZATION OF DISPATCHING SCHEDULE OF READY MIXED CONCRETE (RMC) PLANT FOR MULTI-PLANT AND MULTI-SITE OPERATION CONDITION: A LITERATURE REVIEW

Abstract

The demand of concrete is increasing drastically due to infrastructure development in developing countries and to fulfil this ever-growing demand, RMC industry plays an important role. As per a report published by ICI in August 2015, if the efficiency at RMC plant can be improved by 10%, it will result into saving on Rs. 2400 Crore per year. To improve this efficiency, optimization of dispatching schedule of RMC truck can be done. The main aim of the research is to determine best suited algorithm to optimize dispatching schedule of RMC plant by using multi-plant and multi-site operation condition. The research also aims to determine various factors affecting dispatching schedule of RMC plant by using transit mixtures. To achieve the aim, various route optimization has been studied and compared. It is concluded that, mixing duration, number of transit mixtures, concrete demand of construction site, distance of construction site, casting duration at site, allowed buffer duration, number of plants and external factors are eight factors affecting dispatching schedule of transit mixtures. It is also concluded that genetic algorithm, a soft computing route optimization tool is best suited algorithm to optimize the dispatching schedule of RMC plant with multi-plant and multi-site operation condition.

Key Words

Ready mix concrete, Ready mix concrete dispatching, multi-plant multi-site, Optimization techniques, Vehicle Routing Problem (VRP), Genetic Algorithm (GA).

Cite This Article

"OPTIMIZATION OF DISPATCHING SCHEDULE OF READY MIXED CONCRETE (RMC) PLANT FOR MULTI-PLANT AND MULTI-SITE OPERATION CONDITION: A LITERATURE REVIEW", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 5, page no.f783-f789, May-2021, Available :http://www.jetir.org/papers/JETIR2105770.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"OPTIMIZATION OF DISPATCHING SCHEDULE OF READY MIXED CONCRETE (RMC) PLANT FOR MULTI-PLANT AND MULTI-SITE OPERATION CONDITION: A LITERATURE REVIEW", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 5, page no. ppf783-f789, May-2021, Available at : http://www.jetir.org/papers/JETIR2105770.pdf

Publication Details

Published Paper ID: JETIR2105770
Registration ID: 309919
Published In: Volume 8 | Issue 5 | Year May-2021
DOI (Digital Object Identifier):
Page No: f783-f789
Country: Pune, MAHARASHTRA, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000707

Print This Page

Current Call For Paper

Jetir RMS