UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 5
May-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2205846


Registration ID:
402878

Page Number

h360-h366

Share This Article


Jetir RMS

Title

TO STUDY THE IMPROVED EARNED VALUE MANAGEMENT APPROACH IN CONSTRUCTION PROJECT AT IITM PASHAN PUNE

Abstract

Construction directors cover systems on a frequent base to corroborate that they're performing as anticipated. The construction assiduity invests pregnant time and coffers to ameliorate quality and safety while lowering costs and scheduling counteraccusations. The construction business has a genuine thing to ameliorate construction design operating procedures in order to ameliorate effectiveness. Quality and safety underperformances have historically been caused by inadequately managed quality control and safety exercises. Poor quality work has always influenced construction operations in terms of cost and time. COVID-19's unanticipated issues and enterprises stressed the need to contemporize the construction assiduity's Earned Value Management (EVM) system to reflect these quality and safety conditions. The purpose of this content is to show the Earned Value Construction Operation (EVCM) system, which is a sophisticated EVM system. EVCM has a new suggestion that's linked to quality control exertion and increases the delicacy of design reporting in normal or epidemic structure surroundings. Detailing engineering and administrative safety practices during COVID-19, assaying effective PPE during an epidemic, and statistically assaying design data to demonstrate EVCM are all part of the fashion employed in this debate. This discussion's gift is a piece of field-validated data on the cost and schedule consequences of artificial construction during a COVID-19 terrain EVCM was also created to cast cost and schedule consequences while maintaining quality and safety using an Excel template. The knowledge gained during this debate will ultimately ameliorate the construction assiduity's capability to respond to an epidemic and incorporate quality and safety conditions into a schedule that will allow them to track and manage progress more efficiently.

Key Words

Earned value management, Earned value construction operation, Quality and Safety control, COVID-19, Excel Template

Cite This Article

"TO STUDY THE IMPROVED EARNED VALUE MANAGEMENT APPROACH IN CONSTRUCTION PROJECT AT IITM PASHAN PUNE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 5, page no.h360-h366, May-2022, Available :http://www.jetir.org/papers/JETIR2205846.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"TO STUDY THE IMPROVED EARNED VALUE MANAGEMENT APPROACH IN CONSTRUCTION PROJECT AT IITM PASHAN PUNE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 5, page no. pph360-h366, May-2022, Available at : http://www.jetir.org/papers/JETIR2205846.pdf

Publication Details

Published Paper ID: JETIR2205846
Registration ID: 402878
Published In: Volume 9 | Issue 5 | Year May-2022
DOI (Digital Object Identifier):
Page No: h360-h366
Country: WAGHOLI, MAHARASHTRA, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000278

Print This Page

Current Call For Paper

Jetir RMS