UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 12 | Issue 11 | November 2025

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 12 Issue 11
November-2025
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2511177


Registration ID:
571320

Page Number

b608-b618

Share This Article


Jetir RMS

Title

“Heavy Equipment Management Problem and It’s Remedial Measures on Construction Project”

Abstract

Heavy equipment plays a crucial role in modern construction projects, significantly influencing productivity, project cost, and completion time. However, ineffective management of equipment resources often results in project delays, cost overruns, idle time losses, and safety risks. This paper presents an analytical study on the various problems associated with heavy equipment management and explores practical remedial measures to enhance operational efficiency. The research identifies key challenges such as poor maintenance planning, lack of skilled operators, inadequate scheduling, improper equipment selection, and inefficient tracking systems. Through literature review, field data, and expert interviews, the study evaluates the impact of these problems on project performance parameters including cost, time, and quality. The paper further recommends strategic solutions such as adopting preventive maintenance systems, implementing digital equipment monitoring tools, operator training programs, and effective resource allocation methods. The findings emphasize the importance of systematic equipment management as an integral part of project planning and control to achieve sustainable and cost-effective construction practices.

Key Words

Heavy Equipment Management, Construction Projects, Equipment Utilization, Maintenance Planning, Resource Allocation, Cost Overruns, Productivity, Project Efficiency, Preventive Maintenance, Equipment Scheduling.

Cite This Article

"“Heavy Equipment Management Problem and It’s Remedial Measures on Construction Project”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.12, Issue 11, page no.b608-b618, November-2025, Available :http://www.jetir.org/papers/JETIR2511177.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"“Heavy Equipment Management Problem and It’s Remedial Measures on Construction Project”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.12, Issue 11, page no. ppb608-b618, November-2025, Available at : http://www.jetir.org/papers/JETIR2511177.pdf

Publication Details

Published Paper ID: JETIR2511177
Registration ID: 571320
Published In: Volume 12 | Issue 11 | Year November-2025
DOI (Digital Object Identifier):
Page No: b608-b618
Country: Sangali, Maharasgtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

00043

Print This Page

Current Call For Paper

Jetir RMS