UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 1
January-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIRW006001


Registration ID:
195232

Page Number

1-5

Share This Article


Jetir RMS

Title

Optimization of number of trucks for dispatching schedule operation in ready mixed concrete plant using MATLAB App

Abstract

The Ready Mix Concrete (RMC) batch plant manager has to prepare an efficient schedule of dispatching RMC trucks, which will optimize number of trucks required for a dispatching sequence. There are two major types of costs associated with RMC trucks. One is the cost of owning and maintaining RMC trucks, another is the opportunity cost because of the improper dispatching schedule. From the productivity’s perspective, any duration that RMC trucks wait at the construction site should be treated as a waste of time and represents the cost of the opportunity. Therefore, an efficient and balanced schedule of dispatching RMC trucks not only reduces the opportunity cost of dispatching operation but also minimizes the cost of owning and maintaining RMC trucks. The main objective of this paper is to suggest an App to reduce resources like RMC truck for dispatching schedule operation any RMC plant. This study suggests user friendly Genetic Algorithm (GA) based MATLAB App to give solution to the problem of RMC truck optimization there by reducing the number of trucks used for a dispatching.

Key Words

GA’s applications, Un-interrupted Dispatching schedule, reducing RMC trucks, Optimizing RMC trucks.

Cite This Article

"Optimization of number of trucks for dispatching schedule operation in ready mixed concrete plant using MATLAB App", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 1, page no.1-5, January-2019, Available :http://www.jetir.org/papers/JETIRW006001.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Optimization of number of trucks for dispatching schedule operation in ready mixed concrete plant using MATLAB App", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 1, page no. pp1-5, January-2019, Available at : http://www.jetir.org/papers/JETIRW006001.pdf

Publication Details

Published Paper ID: JETIRW006001
Registration ID: 195232
Published In: Volume 6 | Issue 1 | Year January-2019
DOI (Digital Object Identifier):
Page No: 1-5
Country: -, -, -- .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0003088

Print This Page

Current Call For Paper

Jetir RMS