UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 6 | June 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 11 Issue 5
May-2024
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2405396


Registration ID:
539776

Page Number

d861-d867

Share This Article


Jetir RMS

Title

Lead Time Reduction In Manufacturing Of Geared Coupling

Abstract

This paper delves into the critical aspect of lead time reduction in the manufacturing process of large-sized couplings. By addressing the challenges associated with the substantial size of 1,10,000 Couplings, this study aims to optimize manufacturing workflows, enhance production efficiency, and integrate advanced technologies to reduce lead times without compromising quality. Through a detailed analysis of resource utilization, technology integration, and quality assurance measures, this project presents a strategic framework for achieving significant lead time reduction in the production of large-sized Geared Couplings. Through project implementation, the lead time for manufacturing geared couplings was reduced from 15 days to 9 days, resulting in a 40% decrease in production time and boosting operational efficiency.

Key Words

Lead Time, Value Stream Mapping, Hobbing, Blackoxidizing, Supply Chain, Coupling, Lean Concept

Cite This Article

"Lead Time Reduction In Manufacturing Of Geared Coupling", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.11, Issue 5, page no.d861-d867, May-2024, Available :http://www.jetir.org/papers/JETIR2405396.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Lead Time Reduction In Manufacturing Of Geared Coupling", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.11, Issue 5, page no. ppd861-d867, May-2024, Available at : http://www.jetir.org/papers/JETIR2405396.pdf

Publication Details

Published Paper ID: JETIR2405396
Registration ID: 539776
Published In: Volume 11 | Issue 5 | Year May-2024
DOI (Digital Object Identifier):
Page No: d861-d867
Country: Anand, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

00023

Print This Page

Current Call For Paper

Jetir RMS