UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 5
May-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1905046


Registration ID:
208469

Page Number

279-285

Share This Article


Jetir RMS

Title

COST OPTIMIZATION OF RMC PLANT IN LUCKNOW REGION

Abstract

Ready Mix Concrete is a modern construction material widely used by the construction industry all around the world. RMC is only productive and valuable when it is prepared on time and delivered on time to the consumer. Considering all the factors necessary for efficient work schedule, we have used the multi-criteria decision-making tool Analytic Hierarchy Process for determining the priority customer i.e. the most profitable customer, so that the working of RMC plant will be optimized by making schedule management which will result in higher productivity of plant in every situation of work. In this method, a pairwise comparison is made to find the best combination of sets which has a profitable impact on the RMC plant working process, in every case of factor comparison. Evaluations of factors with best comparisons will give the schedule of a profitable customer within a series of the priority list. By generating the outputs from the Analytic Hierarchy Process method it has been seen that the combinations above from a respected criteria value i.e. consistency ratio will tend the RMC plant in the least profit whereas combinations accepted below criteria value will be profitable, after comparing with all the factors vice versa with importance values from questionnaire survey report.

Key Words

Analytic hierarchy process, productivity, multi criteria decision making tool, priority customer etc.

Cite This Article

"COST OPTIMIZATION OF RMC PLANT IN LUCKNOW REGION", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 5, page no.279-285, May-2019, Available :http://www.jetir.org/papers/JETIR1905046.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"COST OPTIMIZATION OF RMC PLANT IN LUCKNOW REGION", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 5, page no. pp279-285, May-2019, Available at : http://www.jetir.org/papers/JETIR1905046.pdf

Publication Details

Published Paper ID: JETIR1905046
Registration ID: 208469
Published In: Volume 6 | Issue 5 | Year May-2019
DOI (Digital Object Identifier):
Page No: 279-285
Country: LUCKNOW, UTTAR PRADESH, INDIA .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002880

Print This Page

Current Call For Paper

Jetir RMS