UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 5
May-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1905G21


Registration ID:
211311

Page Number

143-149

Share This Article


Jetir RMS

Title

Material management of High Rise Construction Project

Abstract

The goal of material management is to ensure that the materials are available at their point of use when needed. Hence, well-organized procurement of material represents a key role in the successful conclusion of the work. If the materials are not managed properly then it affects the cost of the construction and also the time and effort invested on the construction site is wasted. There are many problems to affect the civil construction project. Like, cost, time, quality, safety, materials etc. This paper shows awareness and considerate of the different factors affecting construction material management is required to reduce project cost overrun and site completion delay. Material management is concerned with the planning, identification, procuring, storage, receiving and distribution of material. For this study, data was collected using both primary and secondary sources. The primary data was obtained through observation and interview of the contractor and site engineer directed to contractors that are involved in building projects. The secondary data was obtained from previously done different researches, internet, journals and books. The secondary data was used as a source for problem identification and was used as criteria for developing and analyzing the primary data. From the material management processes decrease the cost of material and also time saving of high rise construction projects. Materials inventory control like ABC Analysis, FSN Analysis, Bar chart, Job layout are discuss out the different site.

Key Words

ABC Analysis Construction, Bar chart, Job layout Project, High Rise Construction, Material Management, Reduce Cost, Reduce Time

Cite This Article

"Material management of High Rise Construction Project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 5, page no.143-149, May-2019, Available :http://www.jetir.org/papers/JETIR1905G21.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Material management of High Rise Construction Project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 5, page no. pp143-149, May-2019, Available at : http://www.jetir.org/papers/JETIR1905G21.pdf

Publication Details

Published Paper ID: JETIR1905G21
Registration ID: 211311
Published In: Volume 6 | Issue 5 | Year May-2019
DOI (Digital Object Identifier):
Page No: 143-149
Country: Bharuch, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002833

Print This Page

Current Call For Paper

Jetir RMS