UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 5
May-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1905J91


Registration ID:
212302

Page Number

607-611

Share This Article


Jetir RMS

Title

The Study On Efficiency Analysis of Calculating Earthwork Volume

Abstract

: Recently, methods to accurately select an inflection point for the curve of topography that fits well with the actual topography are developed, which reduces errors. However, the existing inconvenient and inaccurate methods are still used for the estimation of the amount of earthworks in the construction field the software based process is applied to improve the existing inconvenient and inaccurate methods in the construction fields. However, most studies were conducted focusing on architectural constructions and even in earthworks, only research on overall project management or the estimation of quantities has been conducted. It is necessary for all the earthwork contractors to calculate the proper and accurate estimate of earthwork. If the estimate of earthwork done by contractor is not accurate then he will be unable to assign the proper construction assets he cannot formulate a project schedule as well. There are many unknowns and assumptions required in estimating the earthwork construction. And this is the reason that while doing this task the contractor is at greatest risk. But seeing today’s scenario which is coming up in Advance Technology Construction field, such as heavy machinery equipment which can complete any work in a short time and in a situation, where work need to be completed in short time, it would be very difficult to calculate the quantity in the old way and if the old way is adopted then it will take a lot of time to complete the work so that to get rid of problem and to bring progress and accuracy to work, we get a lot of help from this software

Key Words

Key words: Slope Gradient, Cut and Fill, Buffer, Elevation Terrain, Surveying, Earthwork, Volume Calculation, Software.

Cite This Article

"The Study On Efficiency Analysis of Calculating Earthwork Volume", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 5, page no.607-611, May-2019, Available :http://www.jetir.org/papers/JETIR1905J91.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"The Study On Efficiency Analysis of Calculating Earthwork Volume", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 5, page no. pp607-611, May-2019, Available at : http://www.jetir.org/papers/JETIR1905J91.pdf

Publication Details

Published Paper ID: JETIR1905J91
Registration ID: 212302
Published In: Volume 6 | Issue 5 | Year May-2019
DOI (Digital Object Identifier):
Page No: 607-611
Country: Dist. - Ratlam, Madhya Pradesh, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002983

Print This Page

Current Call For Paper

Jetir RMS