UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 5
May-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1905P34


Registration ID:
213226

Page Number

222-227

Share This Article


Jetir RMS

Title

Overview of small hydro power plant in pashdan dam in karukh Herat Afghanistan

Abstract

The objective of this project is to come up with the design of small hydropower plant capable of generating 1.3 MW at Karuk River passing through East of Herat City in Afghanistan. The whole Karukh County is suffering from power shortage. This is because the power from the national grid is not sufficient to cater for the demand of the area. The hydropower plant will has an immediate effect on industries already set up. These industries has been suffering from regular power outages and high cost of grid electricity. We selected our discharge to be 4.1m/s which was used for all our calculation in pashdan dam. Thus, the net head (35,5M) and design discharge are the two most important parameters used for design analysis and selection of hydropower components. Lastly, the project is capable of producing more than 1.3 MW of electrical energy. However, pursuing this will be out of our small hydropower bracket. If this project is implemented then the community and country at large can benefit. This project will create employment for the locals and skilled Afghani’. Therefore, during the implementation of the project, we recommended that the other specialist in other fields to be involved

Key Words

Karukh - Herat - Afghanistan, Small Hydropower plant overview

Cite This Article

"Overview of small hydro power plant in pashdan dam in karukh Herat Afghanistan ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 5, page no.222-227, May-2019, Available :http://www.jetir.org/papers/JETIR1905P34.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Overview of small hydro power plant in pashdan dam in karukh Herat Afghanistan ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 5, page no. pp222-227, May-2019, Available at : http://www.jetir.org/papers/JETIR1905P34.pdf

Publication Details

Published Paper ID: JETIR1905P34
Registration ID: 213226
Published In: Volume 6 | Issue 5 | Year May-2019
DOI (Digital Object Identifier): http://doi.one/10.1729/Journal.20970
Page No: 222-227
Country: Pune, Maharashtra , India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002856

Print This Page

Current Call For Paper

Jetir RMS