UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 4
April-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIRES06043


Registration ID:
307405

Page Number

233-237

Share This Article


Jetir RMS

Title

CONTRIVANCING 4D-BIM IN METRO RAIL PROJECT USING POWER PROJECT SOFTWARE

Abstract

Construction Industry faces lot of problems in managing huge projects like Infrastructure, especially the construction and management of Metro Rail project within the assigned duration is a nightmare. There are so many risks and delays associated with the metro projects, as the project takes over 5 years of duration. The metro project causes many types of risks and delays such as excusable, non-excusable, and concurrent delays. As the project involves usage of heavy equipments, over and underground construction of the rail routes, sudden withdrawal of the third parties and other such risks causes commotion and lot of problems, confusion in completion of the work. To avoid such issues, the management should use the proper tool and the apt method in managing and completion of the project. In India, the metro rail has adopted the 4D-BIM tool and has implemented in some of the stations and is in process of doing 5D, though it has the start-ups of the 4D, the scheduling of the projects still lacks proper method. The traditional techniques and tools like CPM, PERT, Primavera, BIM360 and others which are been practiced still lacks and has limitations in the scheduling of the projects. So to avoid all these limited traditional version, this project focuses mainly of using the ELECOSOFT Power Project Software which has more of advantages compared to other traditional tools in implementing the Critical Chain Path Method which allocates resource tasks and buffers to the project’s activities. This CCPM method has proven the early completion of the project with estimated time and cost. So this project is the implementing of the new idea in a new BIM tool with two cases which gives practical solutions to the trending problems in the Metro Rail projects.

Key Words

Metro Rail, 4D-BIM, ELECOSOFT Power Project Software, Critical Chain Path Method(CCPM), Risk and Delay Management.

Cite This Article

"CONTRIVANCING 4D-BIM IN METRO RAIL PROJECT USING POWER PROJECT SOFTWARE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 4, page no.233-237, April-2021, Available :http://www.jetir.org/papers/JETIRES06043.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"CONTRIVANCING 4D-BIM IN METRO RAIL PROJECT USING POWER PROJECT SOFTWARE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 4, page no. pp233-237, April-2021, Available at : http://www.jetir.org/papers/JETIRES06043.pdf

Publication Details

Published Paper ID: JETIRES06043
Registration ID: 307405
Published In: Volume 8 | Issue 4 | Year April-2021
DOI (Digital Object Identifier): http://doi.one/10.1729/Journal.26871
Page No: 233-237
Country: CHENNAI, TAMIL NADU, INDIA .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000644

Print This Page

Current Call For Paper

Jetir RMS