UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 4 Issue 11
November-2017
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1711084


Registration ID:
170937

Page Number

493-500

Share This Article


Jetir RMS

Title

DEVELOPMENT AND OPTIMIZATION OF MANUFACTURING PROCESS PLAN

Abstract

The Process planning acts as a bridge between design and manufacturing, by translating design specifications into manufacturing process detail. Boosters are generally necessary to launch spacecraft into Earth orbit or beyond. The booster is dropped to fall back to Earth once its fuel is expended, a point known as booster engine cut-off (BECO). The rest of the launch vehicle continues flight with its core or upper-stage engines. The booster may be recovered and reused, as in the case of the Space Shuttle. Design specification ensures the functionality aspect. Next step to follow is to assemble these components into final product. In manufacturing, the goal is to produce components that meet the design specifications. Missile parts should be manufactured with high accurate dimensions. Due to its complicated structure, it requires fixture to stop vibrations while machining and to reduce number of setups as well as the production rate also increases by reducing machining time. Because of its complexity in manufacturing, there is a demand to design fixture which reduces the machine time and setups. This project deals with the 3d modeling and fixture design for Booster rocket using NX-CAD software. This project also deals with development of manufacturing process plan of missile component (Booster Rocket used in missile) using CAM software (NX 7.5) which is exclusively CAM software used to generate part program by feeding the geometry of the component) and defining the proper tool path and thus transferring the generated part program to the required CNC machine with the help of DNC lines. The operator thus executes the program with suitable requirements.

Key Words

DEVELOPMENT AND OPTIMIZATION OF MANUFACTURING PROCESS PLAN

Cite This Article

"DEVELOPMENT AND OPTIMIZATION OF MANUFACTURING PROCESS PLAN ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.4, Issue 11, page no.493-500, November-2017, Available :http://www.jetir.org/papers/JETIR1711084.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"DEVELOPMENT AND OPTIMIZATION OF MANUFACTURING PROCESS PLAN ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.4, Issue 11, page no. pp493-500, November-2017, Available at : http://www.jetir.org/papers/JETIR1711084.pdf

Publication Details

Published Paper ID: JETIR1711084
Registration ID: 170937
Published In: Volume 4 | Issue 11 | Year November-2017
DOI (Digital Object Identifier):
Page No: 493-500
Country: -, -, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0003179

Print This Page

Current Call For Paper

Jetir RMS