UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 5 Issue 11
November-2018
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1811B92


Registration ID:
300929

Page Number

630-637

Share This Article


Jetir RMS

Title

An advance for Project Scheduling with PERT/CPM

Abstract

The Petri Nets are more powerful models as compared to the PERT/CPM charts. The Petri Nets show the same type of scheduling constraints as the PERT/CPM charts does. We can easily convert a PERT/CPM networks to a Petri Net model.This work shows how to use Petri net’s for modeling and verifying project management networks. Software for a functional analysis of a Petri Net model is developed. The developed software enables analyzing of a system for its various properties irrespective of time. The software analysis is based on some approaches used to determine the various properties of PN model: livens, safeness, reach-ability and conservativeness. This paper proposes a PN based modeling approach to provide a formal way to verify that all the activities are well connected in the project network. This PN model can then be analyzed through (PN based) scheduling techniques, used to find the critical path, used as a basis to develop algorithms for resource-constrained project management, and used for other decisions related to project management. The proposed PN based approach enables the project manager to consider not only resources but also all different types of variables/constraints related to a project, e.g. costs of activities.

Key Words

CPM, PERT, Petri Net’s, Verifications.

Cite This Article

"An advance for Project Scheduling with PERT/CPM", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.5, Issue 11, page no.630-637, November-2018, Available :http://www.jetir.org/papers/JETIR1811B92.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"An advance for Project Scheduling with PERT/CPM", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.5, Issue 11, page no. pp630-637, November-2018, Available at : http://www.jetir.org/papers/JETIR1811B92.pdf

Publication Details

Published Paper ID: JETIR1811B92
Registration ID: 300929
Published In: Volume 5 | Issue 11 | Year November-2018
DOI (Digital Object Identifier):
Page No: 630-637
Country: --, -, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002942

Print This Page

Current Call For Paper

Jetir RMS