UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 4
April-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1904C75


Registration ID:
206124

Page Number

462-466

Share This Article


Jetir RMS

Title

A RESEARCH ON EFFECTIVE PLANNING AND MANAGEMENT IN THE CONSTRUCTION INDUSTRY SO AS TO AVOID COST OVERRUNS

Abstract

The project management technique of planning and scheduling using tools and devices are helpful in comparing the project with stipulated cost, time and quality. Resource tracking, Minimize the uncertainty and Cost Effectiveness is focused in this project. The software tool used for planning and scheduling is Primavera project planner enterprise for construction. The study covers three case studies of the process of planning, scheduling the activities and monitoring. A general re sequencing model had been proposed to overcome the delay factor from the critical area, to minimize the delay of the construction and to reduce the time, cost and it also helpful to concentrate on the major areas in the project. Re sequencing model leads the management to cost savings and make entire project success. Resource planning is one aspect, which decides the systematic execution of the project at worksite. This study is to have hands- on experience in an ongoing project, and evaluation of schedule of equipment, staff, Labor and Materials. It helps to plan and evaluate the resources for the Construction of the building project. This study also compares the cost variation due to the delay of the project and re scheduling the project by crashing process.

Key Words

Time Overrun, Cost Effectiveness, Construction Industry

Cite This Article

"A RESEARCH ON EFFECTIVE PLANNING AND MANAGEMENT IN THE CONSTRUCTION INDUSTRY SO AS TO AVOID COST OVERRUNS", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 4, page no.462-466, April-2019, Available :http://www.jetir.org/papers/JETIR1904C75.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"A RESEARCH ON EFFECTIVE PLANNING AND MANAGEMENT IN THE CONSTRUCTION INDUSTRY SO AS TO AVOID COST OVERRUNS", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 4, page no. pp462-466, April-2019, Available at : http://www.jetir.org/papers/JETIR1904C75.pdf

Publication Details

Published Paper ID: JETIR1904C75
Registration ID: 206124
Published In: Volume 6 | Issue 4 | Year April-2019
DOI (Digital Object Identifier):
Page No: 462-466
Country: Kanpur, Uttar Pradesh, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002809

Print This Page

Current Call For Paper

Jetir RMS