UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 4
April-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1904E29


Registration ID:
206409

Page Number

174-177

Share This Article


Jetir RMS

Title

A Study on Factors affecting Cost and Time Overrun for Residential Construction Projects by RII

Abstract

In this day and age, construction of buildings in India’s construction industry, are encountering numerous difficulties regarding total cost flow and project schedule. The main aim of this study was to identify, asses the risk factors affecting the total cost and time of project and their effects on construction projects. After thorough and in-depth literature review, forty (40) risk factors were identified. Questionnaire survey and personal interviews were carried out across associates, stakeholders, engineers, contractors and sub-contractors to know their perspectives on causes of cost and time overrun of the project. This study categorizes and asses the risk factors that affect the total cost and time of project using relative importance index (RII) for analysis. Due to utilization of RII, factors were computed so as to get their respective ranks. The most crucial factors that played significant role in increasing the predefined budget and project time were identified as: (1) inflation (RII=0.945), (2) time overrun (RII=0.815), (3) shortage of key materials (RII=0.81), (4) access to funds at reasonable interest rates (RII=0.806), (5) labour shortage (RII=0.805). The study deducted that inflation and time overrun were top two factors having highest impact with RII values 0.945 and 0.815 respectively. Also factors that had the least impact were changes in currency exchange rates and poor communication between parties having RII values 0.32 and 0.314 respectively. Due to identification of these factors, we can prevent complexities, uncertainties and increase in total cost and time of a building project.

Key Words

Risk impact, Relative importance index, and Total cost flow

Cite This Article

"A Study on Factors affecting Cost and Time Overrun for Residential Construction Projects by RII", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 4, page no.174-177, April-2019, Available :http://www.jetir.org/papers/JETIR1904E29.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"A Study on Factors affecting Cost and Time Overrun for Residential Construction Projects by RII", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 4, page no. pp174-177, April-2019, Available at : http://www.jetir.org/papers/JETIR1904E29.pdf

Publication Details

Published Paper ID: JETIR1904E29
Registration ID: 206409
Published In: Volume 6 | Issue 4 | Year April-2019
DOI (Digital Object Identifier):
Page No: 174-177
Country: Mumbai, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002821

Print This Page

Current Call For Paper

Jetir RMS