UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 4
April-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1904R64


Registration ID:
227694

Page Number

1099-1105

Share This Article


Jetir RMS

Title

Power Reformation with Financial Impact in M.P.

Abstract

The Power is a key industry, as it promotes growth in different sectors of the Indian economy such as agriculture, manufacturing, railways, etc. India currently has the fifth-largest capacity in the world to generate electricity. The growth of the economy is expected to increase the demand for electricity in the next few days. For the smooth operation of the economy, the power sector is a critical infrastructure feature. An effective, stable or financially sustainable energy sector is vital to promote state prosperity. Here the financial impact of power sector reforms in reference to Madhya Pradesh state electricity board is being discussed and research performed to show the financial impact on the state through reforms and new schemes for MP. Analysis demonstrates that the power sector can be divided into three vertical products, including AT& C losses. DISCOMS playing a vital role in the power sector is to improve power supply quality or improve service to customers. Specific objectives of a research work focus on the impact of losses (in reduced percentage) from previous to the recent year in form of technical loss, transmission loss, generation loss, AT& C on revenue loss. Also the impact of transmission loss, technical loss on power distribution. Main concern to our work in to make the power sector more financially viable by channelizing the power distribution system. Studies conducted in the field shows that transmission losses reduced from 3% to 2.71%, distribution losses reduced from 17.64 % to 15.91 %, State continues to undertake projects on time to make sure accessibility of 24x7 transmission systems, in support of Madhya Pradesh's power industries, that have increased funding. Help for various measures or goals that utilities as well as other development agencies involved in the energy sector adopt.

Key Words

Madhya Pradesh (SEB), Power Sector, Reforms, DISCOMS, AT &C losses, Financial Impact

Cite This Article

"Power Reformation with Financial Impact in M.P.", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 4, page no.1099-1105, April-2019, Available :http://www.jetir.org/papers/JETIR1904R64.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Power Reformation with Financial Impact in M.P.", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 4, page no. pp1099-1105, April-2019, Available at : http://www.jetir.org/papers/JETIR1904R64.pdf

Publication Details

Published Paper ID: JETIR1904R64
Registration ID: 227694
Published In: Volume 6 | Issue 4 | Year April-2019
DOI (Digital Object Identifier):
Page No: 1099-1105
Country: Gwalior, Madhya pradesh, India .
Area: Other
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002803

Print This Page

Current Call For Paper

Jetir RMS