UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 6
June-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1906468


Registration ID:
214434

Page Number

237-246

Share This Article


Jetir RMS

Title

Comparative Study Between Conventional And Peri Formwork System On The Basis Of Time And Cost

Abstract

The Indian construction industry has grown in manifolds. Construction is a very costly and time-consuming endeavour. Time and cost are very complex factors to be controlled by an engineer in the construction industry. In construction activity formwork takes about 30-40% of the total cost of Reinforced cement concrete(RCC) work. Since formwork is a temporary structure and it does not contribute to the stability of the finished structure, therefore it becomes necessary to keep the formwork cost the barest minimum. The objective of this study is to conduct a comparative study between conventional and Peri formwork system and to determine which comes out to be more time and cost effective. Two sites are selected, on one site conventional formwork is used and on another site Peri formwork is used. Rate of both types of formwork system is calculated using the data collected from the site and a rough estimate of total time and cost on the particular structure is determined. On the basis of the results obtained, a suitable formwork system is recommended for the project under consideration.

Key Words

Conventional formwork, Peri formwork, Time analysis, Cost analysis, Time and cost comparison, Cost and time effective.

Cite This Article

"Comparative Study Between Conventional And Peri Formwork System On The Basis Of Time And Cost ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 6, page no.237-246, June-2019, Available :http://www.jetir.org/papers/JETIR1906468.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Comparative Study Between Conventional And Peri Formwork System On The Basis Of Time And Cost ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 6, page no. pp237-246, June-2019, Available at : http://www.jetir.org/papers/JETIR1906468.pdf

Publication Details

Published Paper ID: JETIR1906468
Registration ID: 214434
Published In: Volume 6 | Issue 6 | Year June-2019
DOI (Digital Object Identifier):
Page No: 237-246
Country: Ahmedabad, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002824

Print This Page

Current Call For Paper

Jetir RMS