UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 6
June-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1906C37


Registration ID:
215117

Page Number

221-229

Share This Article


Jetir RMS

Title

IMPLEMENTATION OF ENTERPRISE RESOURCE PLANNING SYSTEM IN HIGH RISE CONSTRUCTION PROJECTS

Abstract

In construction projects, material management is carried out to minimize wastage of material, shortage of material, damage of material, lack of storage space, and delay in supply. For every construction industry material is required. In construction projects materials constitute major cost. Generally the cost of materials contains major cost of the project. This paper deals with Application of ERP in Mumbai high rise construction Building Project ERP is used and I have make various entries in ERP system like Indent, GRN, ISSUE of each & every material required at IDEAL site and reports generated through this system will allow us to minimize the material wastage by tracking material inventory & stock ageing report allow us to plan and order material efficiently so that Finance can be use in the right time for the right required material. Output of ERP will also provide Engineer in charge on time tracking of material procurement. The efficient procurement of material represents a key role in the successful completion of the work. Poor planning and control of material, lack of material when needed, poor identification of material, re-handling and inadequate storage cause losses in labor productivity and overall delays that can indirectly increase total project cost. Effective management of materials can reduce these costs.

Key Words

ERP, Material management.

Cite This Article

"IMPLEMENTATION OF ENTERPRISE RESOURCE PLANNING SYSTEM IN HIGH RISE CONSTRUCTION PROJECTS ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 6, page no.221-229, June-2019, Available :http://www.jetir.org/papers/JETIR1906C37.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"IMPLEMENTATION OF ENTERPRISE RESOURCE PLANNING SYSTEM IN HIGH RISE CONSTRUCTION PROJECTS ", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 6, page no. pp221-229, June-2019, Available at : http://www.jetir.org/papers/JETIR1906C37.pdf

Publication Details

Published Paper ID: JETIR1906C37
Registration ID: 215117
Published In: Volume 6 | Issue 6 | Year June-2019
DOI (Digital Object Identifier):
Page No: 221-229
Country: -, -, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002819

Print This Page

Current Call For Paper

Jetir RMS