UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 6
June-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1906M08


Registration ID:
217003

Page Number

75-79

Share This Article


Jetir RMS

Title

An investigation of JIT(Just-In-Time) approach in inventory control of construction industry

Abstract

This report presents an overview of the Just-in-Time (JIT) in construction management system and discusses application and implementation issues for the control of material inventory in building construction. Implementation of JIT building material management in construction has the potential to realize the same far reaching benefits experienced in Construction. In this situation, the most useful technique is “just-in-time” construction that provides a significant improvement of project cost and time management. The fundamental principle of this technique is to achieve project time limitations without any unnecessary schedule improvement. During the course of construction, it is necessary to provide constant project control to monitor progress and add resources only when it is required to meet a project service date. Hence, this research report mainly focuses on applicability, significance and barriers to adopt JIT technique in construction projects based on rigorous literature survey Just in time philosophy has lot of Potential for managing movement of construction material from manufacturing yard to construction site. The traditional approach to material delivery has been used in construction industry for many years. It is imbedded in the corporate structure as the way to procure materials. Just-in-time production system is one of these initiatives that focus on cost reduction by eliminating non-value-added activities. This Report Deals with Implementing Just in Time Inventory Control Approach on Construction. JIT has Tremendous Effect on Material Delivery Operation. During Implementation of JIT Organization is required, to put desired efforts on all levels of the work. In this project proposed system is compare with conventional approach of building through Case study

Key Words

Inventory management, Just in Time

Cite This Article

"An investigation of JIT(Just-In-Time) approach in inventory control of construction industry", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 6, page no.75-79, June 2019, Available :http://www.jetir.org/papers/JETIR1906M08.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"An investigation of JIT(Just-In-Time) approach in inventory control of construction industry", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 6, page no. pp75-79, June 2019, Available at : http://www.jetir.org/papers/JETIR1906M08.pdf

Publication Details

Published Paper ID: JETIR1906M08
Registration ID: 217003
Published In: Volume 6 | Issue 6 | Year June-2019
DOI (Digital Object Identifier):
Page No: 75-79
Country: Islampur/Sangali, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002832

Print This Page

Current Call For Paper

Jetir RMS