UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 6
June-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1906R06


Registration ID:
218222

Page Number

760-781

Share This Article


Jetir RMS

Title

Supply Chain Management of Flyover Construction

Abstract

Supply Chain Management is a proven concept in the manufacturing industry and has to come along way in the construction industry. In the Indian construction industry, which is still considered sector, Supply chain management can be implemented with considerable improvements in the material flow and overall cost of project. In construction, procurement and procurement related activities occur during all phases of a construction project. Because of inevitable complexity and fragmentations of the construction process, suppliers of resources like equipment, labour, material and other services may not be always available on time, in right amounts and in the desired quality and price. An overall management process like supply chain management is essential to monitor and control all such logistic activities. The aim of this dissertation is to reduce the cost of project by using SCM model. To study the feasibility of this model, a case study has taken from Pune city to achieve this aim. The case study is construction of flyover at Pune. In this study, a qualitative analysis has done by direct observation on site and interview with the technical staff of both consultant as well as contractor. The case study assesses the supply chain of the project in detailed, finding the problems in supply chain, highlighting the effect of these problems on supply chain. Finally a proposed supply chain is suggested to the contractor, so that he can save the cost of materials as well as lead time giving benefits and limitations of reduction of suppliers.

Key Words

Construction Supply chain management, JIT (Just in time), profitability, cost overrun, time overrun.

Cite This Article

"Supply Chain Management of Flyover Construction", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 6, page no.760-781, June 2019, Available :http://www.jetir.org/papers/JETIR1906R06.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Supply Chain Management of Flyover Construction", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 6, page no. pp760-781, June 2019, Available at : http://www.jetir.org/papers/JETIR1906R06.pdf

Publication Details

Published Paper ID: JETIR1906R06
Registration ID: 218222
Published In: Volume 6 | Issue 6 | Year June-2019
DOI (Digital Object Identifier):
Page No: 760-781
Country: -, -, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002821

Print This Page

Current Call For Paper

Jetir RMS