UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 6 Issue 6
June-2019
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR1907N43


Registration ID:
221596

Page Number

34-37

Share This Article


Jetir RMS

Title

TIME AND COST OPTIMISATION BY DEVELOPMENT OF STANDARD OPERATING PROCEDURES IN CONSTRUCTION PROJECTS

Abstract

The Indian construction industry plays integral role in economy of India. The time and cost are fundamental constraints which are needed to be considered in construction projects. It is necessary to manage these constraints in order to achieve the project success. Cost overrun and time delay are the major problems observed during construction projects so in order to identify these factors affecting time and cost, a survey is conducted with questionnaire. The respondents were asked to rate the listed causes on the basis severity of impact. Importance of each cause is calculated on impact. Relative Imporatance Index and Spearman rank order correlation analysis is used to evaluate whether consensus of opinions exists between Time and Cost. For the time and cost optimisation the mitigating measures are applied in order to develop standard operating procedures in construction projects.

Key Words

Time, Cost, Optimisation, Construction.

Cite This Article

"TIME AND COST OPTIMISATION BY DEVELOPMENT OF STANDARD OPERATING PROCEDURES IN CONSTRUCTION PROJECTS", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.6, Issue 6, page no.34-37, June 2019, Available :http://www.jetir.org/papers/JETIR1907N43.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"TIME AND COST OPTIMISATION BY DEVELOPMENT OF STANDARD OPERATING PROCEDURES IN CONSTRUCTION PROJECTS", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.6, Issue 6, page no. pp34-37, June 2019, Available at : http://www.jetir.org/papers/JETIR1907N43.pdf

Publication Details

Published Paper ID: JETIR1907N43
Registration ID: 221596
Published In: Volume 6 | Issue 6 | Year June-2019
DOI (Digital Object Identifier):
Page No: 34-37
Country: Pune, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002809

Print This Page

Current Call For Paper

Jetir RMS