UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 3 | March 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 7 Issue 2
February-2020
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2002480


Registration ID:
229314

Page Number

494-501

Share This Article


Jetir RMS

Title

IMPROVE THE FACTORS AFFECTING LABOUR PRODUCTIVITY IN INDIAN CONSTRUCTION INDUSTRY

Abstract

The most challenging problem in the construction industry is to improve the efficiency of production. India is a growing economy. It is estimated to be the third largest economy by 2050. The growth of infrastructure is the starting point for a stable and productive society, which offers unique challenges, but also provides opportunities for the public and private sectors to the construction industry. The development engineers, supervisors and craftsmen in India, to identify the factors that affect the productivity of construction workers. Construction will lead to a massive construction and there will be a positive growth in the industries related to construction. Reports also indicate that these sectors have seen an upward trend. The objective of this paper is to identify the factors that affect labor productivity in construction projects. Review of the literature and factors recommended by experts to classify and analyze factors. This study presents the results of a survey to project managers, site engineer projects suffer technical and complex factors, such as labor, cost, time, quality and safety. The construction sector is diverse, with contractors, consultants, designers, owners and others. Productivity is a problem in many countries and one of the most important factors that affect the overall performance of any small, medium or large construction industry. This paper explains that the factors that affect labor productivity in the construction industry in India through many investigations and analyzes offer a proposal to improve productivity and justify the most influential factors.

Key Words

Construction Industry, Construction Projects, Productivity, Construction Workers.

Cite This Article

"IMPROVE THE FACTORS AFFECTING LABOUR PRODUCTIVITY IN INDIAN CONSTRUCTION INDUSTRY", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.7, Issue 2, page no.494-501, February 2020, Available :http://www.jetir.org/papers/JETIR2002480.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"IMPROVE THE FACTORS AFFECTING LABOUR PRODUCTIVITY IN INDIAN CONSTRUCTION INDUSTRY", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.7, Issue 2, page no. pp494-501, February 2020, Available at : http://www.jetir.org/papers/JETIR2002480.pdf

Publication Details

Published Paper ID: JETIR2002480
Registration ID: 229314
Published In: Volume 7 | Issue 2 | Year February-2020
DOI (Digital Object Identifier):
Page No: 494-501
Country: Ambala, Haryana, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002986

Print This Page

Current Call For Paper

Jetir RMS