UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 5
May-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2105086


Registration ID:
308818

Page Number

a690-a695

Share This Article


Jetir RMS

Title

ESTIMATION OF PRINCIPAL BLOCK AT GMC ANANATNAG, J&K, INDIA

Abstract

Estimation is the key process of construction after designing, as this step determines the cost in a project. During construction project planning and implementation, we need to know the quantities and costs of various items required to meet the objective of the project. That is, construction project manager has to anticipate the cost of project. The process of calculation of quantities and costs of various items in connection with the construction project is called an “estimate”. An estimate is prepared by first obtaining the quantity of the items required to complete the project and multiplied by unit cost of the items. Details of the estimate depend upon the purpose of carrying out estimate. It is important to find the pre-construction cost of principal block (government building) so that the owner of the business can analyze the profit/ loss margins. The construction manager and the owner should always keep in mind that the investment cost should not precede the future income. It is important to maintain a balance between planned costs, both direct and overhead, and wished profit. Through this project we aim to calculate and analyze the abstract of cost of a government building, more over we also aim to prepare and analyze the bar bending schedule. The type of estimation used is detailed estimate by total quantity method. The calculation of material and bar bending schedule is done in MS excel.

Key Words

LONGWALL-SHORTWALL, ESTIMATION, MS excel, BARBENDING SCHEDULE, DETAILED ESTIMATE

Cite This Article

"ESTIMATION OF PRINCIPAL BLOCK AT GMC ANANATNAG, J&K, INDIA", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 5, page no.a690-a695, May-2021, Available :http://www.jetir.org/papers/JETIR2105086.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"ESTIMATION OF PRINCIPAL BLOCK AT GMC ANANATNAG, J&K, INDIA", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 5, page no. ppa690-a695, May-2021, Available at : http://www.jetir.org/papers/JETIR2105086.pdf

Publication Details

Published Paper ID: JETIR2105086
Registration ID: 308818
Published In: Volume 8 | Issue 5 | Year May-2021
DOI (Digital Object Identifier):
Page No: a690-a695
Country: JALANDHAR, Punjab, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000530

Print This Page

Current Call For Paper

Jetir RMS