UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 5
May-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2105185


Registration ID:
308834

Page Number

b425-b430

Share This Article


Jetir RMS

Title

Analysis and monitoring of highway project - a case study of Seoni Mohagaon project

Abstract

The role of construction industry in the country’s economy is increasing by each passing day and that is the reason why construction industry has become the second largest industry of this country. But our construction industry is lacking by the advancements and technologies in project planning and management which is the major reason for the delays and the cost overruns in the project completion. The time duration of any project can be optimized by proper planning, scheduling and resource allocation, and not only the time duration it also affects the cost of the whole project. In this study, ‘Seoni Mohagaon stretch’ is the ongoing project which is running delayed by its pre-scheduled duration. Here I am planning a scheduling of this project considering all the flaws observed in the project and providing a proper solution to this work considering manual resources analysis and assigning lag to individual activity. The main aim of this study is to explore the use of project management software called Oracle Primavera P6 in the construction field because the proper project management and planning has a vital role in the execution of construction works. With the help of Oracle’s Primavera P6 software, a comparative study of this project is carried out in between the actual site work progress and the software scheduling with the standard data. And also the resource allocation of this project is done on the basis of the coefficients from IS: 7272 part-1 central region.

Key Words

Planning, Scheduling, Resource allocation, Controlling, Primavera, Lagging, Tracking, and Construction.

Cite This Article

"Analysis and monitoring of highway project - a case study of Seoni Mohagaon project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 5, page no.b425-b430, May-2021, Available :http://www.jetir.org/papers/JETIR2105185.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Analysis and monitoring of highway project - a case study of Seoni Mohagaon project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 5, page no. ppb425-b430, May-2021, Available at : http://www.jetir.org/papers/JETIR2105185.pdf

Publication Details

Published Paper ID: JETIR2105185
Registration ID: 308834
Published In: Volume 8 | Issue 5 | Year May-2021
DOI (Digital Object Identifier):
Page No: b425-b430
Country: Bhopal, Madhya Pradesh, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000464

Print This Page

Current Call For Paper

Jetir RMS