UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 3 | March 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 7
July-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2107640


Registration ID:
312984

Page Number

f70-f77

Share This Article


Jetir RMS

Title

ENHANCING CONSTRUCTION PRODUCTIVITY BY MICROSOFT PROJECT FOR PLANNING, SCHEDULING AND RESOURCE ALLOCATION

Abstract

A high-rise building's construction is a type of repetitive construction in which the same basic unit (typical poor of structure) is repeated multiple times. Delays and cost overruns can easily occur as a result of poor scheduling. Planning and scheduling a project should employ proper methodologies; management decisions should not be based solely on experience and intuition. The construction of a high-rise building is a sort of repetitive construction in which the same basic unit (typical poor of structure) is repeated numerous times. There is evidence that contractors avoid utilizing Gantt charts and network schedules in highly repetitious projects because they are resource and time restricted. Every building project is determined by two critical factors: cost and timing. The primary goal of project management is to finish the project on time, on budget, and with guaranteed quality. Adopting traditional execution techniques makes it difficult to consistently monitor work progress, review plans, track cost and time, and execute corrective actions as needed.

Key Words

Planning, Scheduling, Gantt Chart, Cost, Time, Project Management.

Cite This Article

"ENHANCING CONSTRUCTION PRODUCTIVITY BY MICROSOFT PROJECT FOR PLANNING, SCHEDULING AND RESOURCE ALLOCATION", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 7, page no.f70-f77, July-2021, Available :http://www.jetir.org/papers/JETIR2107640.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"ENHANCING CONSTRUCTION PRODUCTIVITY BY MICROSOFT PROJECT FOR PLANNING, SCHEDULING AND RESOURCE ALLOCATION", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 7, page no. ppf70-f77, July-2021, Available at : http://www.jetir.org/papers/JETIR2107640.pdf

Publication Details

Published Paper ID: JETIR2107640
Registration ID: 312984
Published In: Volume 8 | Issue 7 | Year July-2021
DOI (Digital Object Identifier):
Page No: f70-f77
Country: BHIWANDI, THANE-421302, MAHARASHTRA, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000563

Print This Page

Current Call For Paper

Jetir RMS