UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 13 | Issue 3 | March 2026

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 8
August-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2108064


Registration ID:
313574

Page Number

a502-a510

Share This Article


Jetir RMS

Title

“Study of Last Planner System in Construction Industry”

Abstract

In traditional management work is broken down into smaller packages and activities and allocated specific time duration for the completion of the activities using critical path method. CPM method considers the float for the non-critical activities through which these activities can be delayed so the total time of the project is not affected but the greatest disadvantage of CPM is that it does not consider the time required for the information and material flow. But taking into account the dynamic nature of the construction industry information and material flow presentation becomes very important. This representation can be done with the help of the LPS. Last Planner manages the relationships, conversations and commitments that together enable program & production planning decisions to be made collaboratively at the lowest possible level in a whole range of one-off production settings software development, ship building, yacht fit-out, construction and other examples of one-off production. With adaptations, LPS works in new product development and design too.

Key Words

Last Planner System, Lean construction.

Cite This Article

"“Study of Last Planner System in Construction Industry”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 8, page no.a502-a510, August-2021, Available :http://www.jetir.org/papers/JETIR2108064.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"“Study of Last Planner System in Construction Industry”", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 8, page no. ppa502-a510, August-2021, Available at : http://www.jetir.org/papers/JETIR2108064.pdf

Publication Details

Published Paper ID: JETIR2108064
Registration ID: 313574
Published In: Volume 8 | Issue 8 | Year August-2021
DOI (Digital Object Identifier):
Page No: a502-a510
Country: Jalgaon, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000713

Print This Page

Current Call For Paper

Jetir RMS