UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 13 | Issue 3 | March 2026

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 8
August-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2108065


Registration ID:
313572

Page Number

a511-a520

Share This Article


Jetir RMS

Title

Project Cost Overrun

Abstract

Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective cost performance. This research work is carried out on studying significant factors causing Cost overruns in Indian construction projects. A valid questionnaire for the survey was developed based on factors for cost overruns identified from literature review Most of the construction project is successful only if the missions are achieved as per planned schedule and minimum cost i.e. without time and cost overrun. The main purpose of research which has categorized the causes responsible for time and cost overruns in projects. Investigation was carried out with quantitative approach of questionnaire survey to understand the perception of practitioners involved in construction industry towards various factors in causing time and cost overrun. A valid questionnaire for the survey was developed based on factors for cost overruns identified from literature review. The targeted respondents were client, contractor, owner and consultant representative involved in handling construction projects. The most critical factors are identified using questionnaire survey and analyzed the interrelationship and frequency of those factors using SPSS (Statistical Package for Social Sciences) Software Version 20. The study will helps to identify the critical factors for cost overrun and can find out the solutions and recommendations which can be considered to control those factors.

Key Words

Construction Industry, Cost overruns, India, SPSS software

Cite This Article

"Project Cost Overrun", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 8, page no.a511-a520, August-2021, Available :http://www.jetir.org/papers/JETIR2108065.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Project Cost Overrun", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 8, page no. ppa511-a520, August-2021, Available at : http://www.jetir.org/papers/JETIR2108065.pdf

Publication Details

Published Paper ID: JETIR2108065
Registration ID: 313572
Published In: Volume 8 | Issue 8 | Year August-2021
DOI (Digital Object Identifier):
Page No: a511-a520
Country: Nashik, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000887

Print This Page

Current Call For Paper

Jetir RMS