UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 8 Issue 11
November-2021
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2111154


Registration ID:
317019

Page Number

b427-b433

Share This Article


Jetir RMS

Title

OPTIMUM UTILIZATION OF CONSTRUCTION EQUIPMENTS FOR HIGHWAY PROJECT

Abstract

A large share of investment funds in all developing countries is finding a way to construction. In India, construction industry is growing rapidly with the development of infrastructure projects, so construction equipment is an important resource. Due to time and quality restrictions, highway construction projects consume a large amount of resources on and off the field in the form of plants and equipment. As a result, it is necessary to optimize these activities in order to save costs. Construction equipment plays a crucial part in four-lane construction, accounting for up to 36% of overall project expenses. However, equipment maintenance has not received adequate attention, resulting in a 40% cost overrun. The purpose of this research study is to examine the most efficient use of construction equipment for the National Highway project. It also contains a cost-benefit analysis of equipment in terms of output, time, and cost. Production capacity, effective working hours, and equipment cost are all taken into account when performing these optimizations. A case study of four lanes of the Chikhali-Tarsod Highway Projects under section Nh-6 (Jalgaon) is used to validate the results.

Key Words

Equipment economics, Productivity, Total cost, Optimization.

Cite This Article

"OPTIMUM UTILIZATION OF CONSTRUCTION EQUIPMENTS FOR HIGHWAY PROJECT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.8, Issue 11, page no.b427-b433, November-2021, Available :http://www.jetir.org/papers/JETIR2111154.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"OPTIMUM UTILIZATION OF CONSTRUCTION EQUIPMENTS FOR HIGHWAY PROJECT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.8, Issue 11, page no. ppb427-b433, November-2021, Available at : http://www.jetir.org/papers/JETIR2111154.pdf

Publication Details

Published Paper ID: JETIR2111154
Registration ID: 317019
Published In: Volume 8 | Issue 11 | Year November-2021
DOI (Digital Object Identifier):
Page No: b427-b433
Country: Pune, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000416

Print This Page

Current Call For Paper

Jetir RMS