UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 6
June-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2206525


Registration ID:
404485

Page Number

f189-f197

Share This Article


Jetir RMS

Title

Waste management of the construction project

Abstract

In every field of work, Construction wastage of few or various things are bound to happen. Construction industry is one of the industries which produces waste on a large scale and it is increasing by every passing year. In India, the demolition and construction waste are expected around 150 million tonnes per year. Many foreign countries are way ahead of us in management of waste as they recycle the produced waste. The reason behind studying this topic is to focus on waste and to reduce the waste due to which large amount of cost can be saved in any infrastructure. In some regions, the engineers and contractors are also not aware of the waste management, so, it is high time to create an awareness about this. In this research study, an actual site was taken and a feasibility study was done. Further, it came to light that the some of them decided some amount of planned waste but in real world scenario it was much more. So, to fill that gap, in this study where that unplanned waste goes is to be identified. The methodology used in the work, was done by questionnaire survey and site observation. The forms were filled up by the experts who gave their remarks accordingly. The analysis of all the data which was collected, was done by a method known as Frequency Analysis method. Lastly, this research study concluded that, there were total number of 34 factors were chosen in which 15 factors were highly affected. In which, the top three factors were (1) Planned waste costs and actual waste costs should be calculated (2) Delays in the work of the contractor (3) No Punishment for labour more wastage.

Key Words

Waste management, Construction waste, Cost reduction, Waste minimization

Cite This Article

"Waste management of the construction project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 6, page no.f189-f197, June-2022, Available :http://www.jetir.org/papers/JETIR2206525.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Waste management of the construction project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 6, page no. ppf189-f197, June-2022, Available at : http://www.jetir.org/papers/JETIR2206525.pdf

Publication Details

Published Paper ID: JETIR2206525
Registration ID: 404485
Published In: Volume 9 | Issue 6 | Year June-2022
DOI (Digital Object Identifier):
Page No: f189-f197
Country: Jagatpur, Ahmedabad 382481, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000222

Print This Page

Current Call For Paper

Jetir RMS