UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 6
June-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2206555


Registration ID:
404493

Page Number

f435-f442

Share This Article


Jetir RMS

Title

Factor Affecting Labour Productivity In Construction Projects

Abstract

The construction industry plays a critical role in any developing country. Productivity is mostly related with performance of labour, it is one of the most important variable that influenced the growth of construction industry. Productivity loss is one of the serious issues in the construction firms. The cost of labour in construction sector is estimated to be between 33% to 50% of the total project cost, because labour is more variable than other project costs. Productivity growth can reduce labour costs in a direct proportion. It can either increase or decrease the profit of project. The purpose of this research study was to determine the factors that affect labour productivity in construction projects. This research is done for factor affecting labour productivity in construction projects. This research focuses on a construction companies that listed with Rajkot Municipal Corporation (R.M.C). In this study questionnaire forms are distributed to the contractors which listed in R.M.C. The analysis of factors was done using Frequency index method and given ranking to the factors. From analysis, it can be concluded that top five factors which are affect productivity of labours is, 1) Rainy season, 2) Proper work allocation, 3) Shortage issue of labours, 4) Lack of safety tools, 5) No daily target given to the labours.

Key Words

Labour productivity, Factors, Construction Projects, Frequency index method, Questionnaire survey

Cite This Article

"Factor Affecting Labour Productivity In Construction Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 6, page no.f435-f442, June-2022, Available :http://www.jetir.org/papers/JETIR2206555.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Factor Affecting Labour Productivity In Construction Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 6, page no. ppf435-f442, June-2022, Available at : http://www.jetir.org/papers/JETIR2206555.pdf

Publication Details

Published Paper ID: JETIR2206555
Registration ID: 404493
Published In: Volume 9 | Issue 6 | Year June-2022
DOI (Digital Object Identifier):
Page No: f435-f442
Country: Rajkot, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000204

Print This Page

Current Call For Paper

Jetir RMS