UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 6
June-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2206580


Registration ID:
404588

Page Number

f623-f635

Share This Article


Jetir RMS

Title

Risk Management in Infrastructure Projects

Abstract

Risk is that one factor which every human will face in every facet of life, whether in life or in a work situation. In today’s world, development is constant and where there is progress there are various risks involved in it. Be it any field, the involvement of hazards has been consistent. In early life, there was a huge conundrum in this simple human mind about how to tolerate risk but as the time passed and we moved towards the modernization, the problem of risks has been decreased. In the world, the construction industry has been valued hugely. In Indian economy some amount of percentage is contributed by the infrastructure projects. In this study, we will discuss about the identification and analyzing those various hazards which affect the infrastructure projects. It is a very necessary step because millions of rupees are spent on these types of projects. In this research work, we have selected canal infrastructure as my field of research. The logic behind studying the risk management of canal work is that in India there are very fewer literatures based on canals. Moreover, canals in India are one of the most important as it supplies water to farmer’s land in which crops are cultivated. The identification and analysis of hazards is very important in the infrastructure projects. So that was the main problem which was detected. The methodology used in my study for data collection was questionnaire survey. 10 major risks were identified and then it was sub-divided further. Following the collection of data, analysis was done based on probabilistic analysis, severity analysis and risk matrix. In the end, all the results which we gathered, were all compared through a scale and they were categorized accordingly. The factors which were dominant are (1) Electricity risk (2) Having black cotton soil and (3) Change in design.

Key Words

Risk management, Canal work, Infrastructure projects, Construction management

Cite This Article

"Risk Management in Infrastructure Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 6, page no.f623-f635, June-2022, Available :http://www.jetir.org/papers/JETIR2206580.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Risk Management in Infrastructure Projects", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 6, page no. ppf623-f635, June-2022, Available at : http://www.jetir.org/papers/JETIR2206580.pdf

Publication Details

Published Paper ID: JETIR2206580
Registration ID: 404588
Published In: Volume 9 | Issue 6 | Year June-2022
DOI (Digital Object Identifier):
Page No: f623-f635
Country: Ahmedabad, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000201

Print This Page

Current Call For Paper

Jetir RMS