UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 5 | May 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 8
August-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2208265


Registration ID:
500746

Page Number

c591-c603

Share This Article


Jetir RMS

Title

Experiment on Precast and its future

Abstract

In recent treads a wide range of building materials are available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. Various types of construction waste with different characteristics are created at all the stages of construction. Delays have been frequently reported as the cause of several conflicts that affect the different parties involved in construction projects. Project Time Management (PTM) includes a number of planning and controlling processes that are recommended for complying with requirements related to project time. The performance of the construction industry and its contribution to the welfare of society in comparison to other industries such as the manufacturing industry has lately been the focus of many commissioned reports and academic research publications. The so-called —iron triangle of time, cost and quality have been the most important metrics of construction project performance, especially for the selection of appropriate procurement methods. The perceived inefficiencies emanate from increasing construction costs, conflicts and client dissatisfaction, the fragmented nature of the industry, cost overrun, delays and lack of quality improvement. There is observed disparity in increase in housing construction costs and an apparent lack of quality improvement of infrastructure transport projects. Other empirical data from a secondary source were also used.

Key Words

Cite This Article

"Experiment on Precast and its future", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 8, page no.c591-c603, August-2022, Available :http://www.jetir.org/papers/JETIR2208265.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Experiment on Precast and its future", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 8, page no. ppc591-c603, August-2022, Available at : http://www.jetir.org/papers/JETIR2208265.pdf

Publication Details

Published Paper ID: JETIR2208265
Registration ID: 500746
Published In: Volume 9 | Issue 8 | Year August-2022
DOI (Digital Object Identifier):
Page No: c591-c603
Country: Mumbai, Maharastra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000131

Print This Page

Current Call For Paper

Jetir RMS