UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 12 | Issue 4 | April 2025

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 8
August-2024
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2208627


Registration ID:
546000

Page Number

g203-g213

Share This Article


Jetir RMS

Title

PERFORMANCE ANALYSIS AND ENERGY AUDIT ON BOILER LOSSES IN THERMAL POWER PLANT

Abstract

Energy audit involves studying energy consumption processes to find better paths for energy saving. For this study, Kottagudem Thermal Power Station, Stage VII-1 X 800 MW Coal-based thermal power plant, a supercritical boiler, was selected. In this project, an energy audit was conducted on a boiler to identify various losses. One such loss is heat loss due to dry flue gas, which acts as a barrier to heat transfer in the economizer section, located in the boiler's second pass. This loss prevents proper preheating of water, potentially affecting both boiler efficiency and fuel consumption. Various parameters were measured in this study, including coal consumption, steam pressure, coal calorific value, flue gas temperature, and proximate analysis of coal. The primary objective was to reduce heat loss due to dry flue gases by modifying the existing system of steam-based soot blowers. Currently, steam is used as the working medium to clean the flue gases surrounding the economizer coils. However, this method is insufficient in reducing heat loss and is costly. Therefore, modification in both the working medium and the machine (soot blower) is necessary. In this modification, the medium is changed from steam to hot air to efficiently clean the flue gases in the economizer coils and improve heat transfer rates. Additionally, the soot blower lance and speed are upgraded. Now that air is the medium, which is cheap and readily available, there is no need to use steam. This change saves energy and coal, impacting both boiler and overall plant efficiency. However, this process may not be economical for existing power plants due to significant changes required in the boiler section. Therefore, it is highly recommended for upcoming thermal power plants

Key Words

Thermal Power Plant, Energy Audit, Boiler Efficiency, Soot Blowers, Heat Losses.

Cite This Article

"PERFORMANCE ANALYSIS AND ENERGY AUDIT ON BOILER LOSSES IN THERMAL POWER PLANT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 8, page no.g203-g213, August-2022, Available :http://www.jetir.org/papers/JETIR2208627.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"PERFORMANCE ANALYSIS AND ENERGY AUDIT ON BOILER LOSSES IN THERMAL POWER PLANT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 8, page no. ppg203-g213, August-2022, Available at : http://www.jetir.org/papers/JETIR2208627.pdf

Publication Details

Published Paper ID: JETIR2208627
Registration ID: 546000
Published In: Volume 9 | Issue 8 | Year August-2024
DOI (Digital Object Identifier):
Page No: g203-g213
Country: -, -, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000106

Print This Page

Current Call For Paper

Jetir RMS