UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 9 Issue 9
September-2022
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2209365


Registration ID:
502728

Page Number

d546-d551

Share This Article


Jetir RMS

Title

PRODUCTION PLANNING AND CONTROL IN KERALA SIDCO GOVERNMENT INSTRUMENT WORKSHOP, TRIVANDRUM - A SURVEY REPORT

Abstract

The study is entitled “Production Planning and Control in Kerala SIDCO Government Instrument Workshop, Trivandrum - A Survey Report”. Production planning and control address a fundamental problem of low productivity, inventory management and resource utilization. Production planning is required for scheduling, dispatch, inspection, quality management, inventory management, supply management and equipment management. Production control ensures that production team can achieve required production target, optimum utilization of resources, quality management and cost savings. The objective of the study is to identify whether production planning and control practices lead to increased productivity in Kerala SIDCO Government Instrument Workshop Trivandrum. To find out the optimum utilization of resources and to analyze the efficient use of equipment and facilities in Kerala SIDCO Government Instrument Workshop Trivandrum. The primary data were collected using questionnaire and personal interview techniques. Secondary data is second-hand data collected by other parties and already having undergone statistical analysis. The sample size collected for the study is 50 employees. The collected data were analyzed by using relevant statistical techniques like Percentage Analysis, Chi-squared test Weighted Average method. This study revealed that SIDCO has a low production planning system and they need to implement some changes to achieve maximum productivity in the near future.

Key Words

Production Planning and Control, SIDCO, Government Instrument Workshop.

Cite This Article

"PRODUCTION PLANNING AND CONTROL IN KERALA SIDCO GOVERNMENT INSTRUMENT WORKSHOP, TRIVANDRUM - A SURVEY REPORT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.9, Issue 9, page no.d546-d551, September-2022, Available :http://www.jetir.org/papers/JETIR2209365.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"PRODUCTION PLANNING AND CONTROL IN KERALA SIDCO GOVERNMENT INSTRUMENT WORKSHOP, TRIVANDRUM - A SURVEY REPORT", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.9, Issue 9, page no. ppd546-d551, September-2022, Available at : http://www.jetir.org/papers/JETIR2209365.pdf

Publication Details

Published Paper ID: JETIR2209365
Registration ID: 502728
Published In: Volume 9 | Issue 9 | Year September-2022
DOI (Digital Object Identifier):
Page No: d546-d551
Country: Kanyakumari, Tamil Nadu, India .
Area: Management
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000136

Print This Page

Current Call For Paper

Jetir RMS