UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 12 | Issue 10 | October 2025

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 11 Issue 7
July-2024
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2407523


Registration ID:
545431

Page Number

f140-f145

Share This Article


Jetir RMS

Title

A Research Paper on Analysis of Construction Delays and Their Impact on Project Completion Time and Cost

Abstract

This study intends to examine the reasons for construction delays and their effects on the cost and schedule of project completion. The study will look into a number of factors, including weather, labor shortages, changes in design, and material availability that affect building delays. Furthermore, the study will investigate the direct and indirect effects of these delays on the time and cost required to complete the project, including higher labor costs, longer project durations, and possible fines. The results of this study will offer insightful information on how crucial it is to control construction delays well in order to reduce their detrimental influence on project outcomes. In the construction industry, delays in construction are a frequent occurrence that have a major impact on the cost and time required to complete projects. The objective of this research is to examine the reasons behind construction delays, their consequences, and how they affect the cost and schedule of project completion. Statistical analysis, survey and interview data collecting, and a thorough literature review comprise the research approach used. An overview of the several variables that affect construction delays is given by the literature review, which includes modifications to the design, unfavorable weather, a shortage of materials, low labor productivity, and poor project management. The many kinds of delays, including excused and non-excusable delays, as well as their legal ramifications, are also covered in the study. Professionals in the construction industry, such as project managers, contractors, and subcontractors, are surveyed and interviewed in order to gather data. To determine the main reasons for delays and how they affect the duration and expense of the project's completion, the gathered data is statistically examined using techniques like regression analysis and correlation analysis. According to the study's findings, design modifications, insufficient project planning, and a lack of coordination among project stakeholders are the most frequent reasons for construction delays.

Key Words

Construction Delay; Sorts of Delay, Factors affecting Delay, Regression analysis, Causes of Delay etc.

Cite This Article

"A Research Paper on Analysis of Construction Delays and Their Impact on Project Completion Time and Cost", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.11, Issue 7, page no.f140-f145, July-2024, Available :http://www.jetir.org/papers/JETIR2407523.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"A Research Paper on Analysis of Construction Delays and Their Impact on Project Completion Time and Cost", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.11, Issue 7, page no. ppf140-f145, July-2024, Available at : http://www.jetir.org/papers/JETIR2407523.pdf

Publication Details

Published Paper ID: JETIR2407523
Registration ID: 545431
Published In: Volume 11 | Issue 7 | Year July-2024
DOI (Digital Object Identifier):
Page No: f140-f145
Country: Kolhapur, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000244

Print This Page

Current Call For Paper

Jetir RMS