UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 12 | Issue 9 | September 2025

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 11 Issue 11
November-2024
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2411623


Registration ID:
551663

Page Number

g249-g267

Share This Article


Jetir RMS

Title

Risks Identification and Mitigation during Utility Remote Terminal Unit (RTU) Upgrade Project

Authors

Abstract

The Remote Terminal Unit (RTU) upgrade project plays a pivotal role in modernizing gas distribution operations within the gas utility sector. These projects are critical to ensuring system reliability, addressing technological obsolescence, and aligning with evolving industry standards. However, they also introduce various potential risks that can jeopardize project outcomes if not properly managed. This paper identifies key risks associated with RTU upgrades, including security vulnerabilities, technological obsolescence, and challenges related to compatibility with existing systems. To mitigate these risks, this study outlines a series of strategic recommendations. Robust cybersecurity protocols are emphasized to protect sensitive operational data and prevent unauthorized access. Comprehensive testing processes, such as Factory Acceptance Testing (FAT) and real-world scenario validations, are recommended to identify and address system bugs or performance issues before full deployment. Improved communication frameworks and clearly defined roles among stakeholders ensure better coordination and alignment across departments. Standardized design practices and thorough documentation reduce inconsistencies and enhance efficiency in construction and maintenance phases. Additionally, engaging with vendors strategically, implementing proactive material procurement and management practices, and optimizing project schedules are essential measures to minimize delays and cost overruns. This paper provides a roadmap for utility companies to successfully navigate the complexities of RTU upgrades. By following the proposed guidelines and best practices, organizations can enhance the efficiency, reliability, and security of their gas distribution systems while laying a strong foundation for future technological advancements. The insights presented aim to serve as a valuable resource for similar projects, contributing to the advancement of modernized and resilient infrastructure in the gas utility industry.

Key Words

Remote Terminal Unit, RTU Upgrade, SCADA Systems, Risk Management, Risk Mitigation

Cite This Article

"Risks Identification and Mitigation during Utility Remote Terminal Unit (RTU) Upgrade Project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.11, Issue 11, page no.g249-g267, November-2024, Available :http://www.jetir.org/papers/JETIR2411623.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"Risks Identification and Mitigation during Utility Remote Terminal Unit (RTU) Upgrade Project", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.11, Issue 11, page no. ppg249-g267, November-2024, Available at : http://www.jetir.org/papers/JETIR2411623.pdf

Publication Details

Published Paper ID: JETIR2411623
Registration ID: 551663
Published In: Volume 11 | Issue 11 | Year November-2024
DOI (Digital Object Identifier):
Page No: g249-g267
Country: -, -, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

000167

Print This Page

Current Call For Paper

Jetir RMS