UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 5 Issue 11
November-2018
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIRDR06043


Registration ID:
229686

Page Number

275-287

Share This Article


Jetir RMS

Title

BALANCING THE CRANKSHAFT MACHINING LINE TO IMPROVE THE QUALITY AND OVERALL EFFICIENCY OF PRODUCTION LINE

Abstract

As the technology is advancing and modifying, the competition among the companies increases and they are eagerly working over the things to just minimize the time bounding to produce a product by introducing and verifying various technical and physical aspects. The companies now days are also proceeding towards the certification from the external bodies to get their best for their customers. In the present case, the component considered is the crank shaft manufactured in one of the companies at Ludhiana, wherein the process there was a time lag and the line was observed not completely balanced. Further, in the present case, the main aim was to use our theoretical aspects as much as possible to shape them up in practical format. Few major findings at the initial stage were observed as Unbalanced line and shortage of the material from POD machining for next operation. The line cycle time observed as 0.17 seconds during POD turning and rest of operations contains approx. 0.12 seconds. The relevant data has been collected and after brainstorming, it has been suggested to introduce new drilling machines for the drills during the POD turning operations. Two new operations for drilling has been suggested in between and it has been observed that the line cycle time for POD turning has reduced to 0.12 seconds from 0.17 seconds. The line has been balanced following such little improvement.

Key Words

BALANCING THE CRANKSHAFT MACHINING LINE TO IMPROVE THE QUALITY AND OVERALL EFFICIENCY OF PRODUCTION LINE

Cite This Article

"BALANCING THE CRANKSHAFT MACHINING LINE TO IMPROVE THE QUALITY AND OVERALL EFFICIENCY OF PRODUCTION LINE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.5, Issue 11, page no.275-287, November 2018, Available :http://www.jetir.org/papers/JETIRDR06043.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"BALANCING THE CRANKSHAFT MACHINING LINE TO IMPROVE THE QUALITY AND OVERALL EFFICIENCY OF PRODUCTION LINE", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.5, Issue 11, page no. pp275-287, November 2018, Available at : http://www.jetir.org/papers/JETIRDR06043.pdf

Publication Details

Published Paper ID: JETIRDR06043
Registration ID: 229686
Published In: Volume 5 | Issue 11 | Year November-2018
DOI (Digital Object Identifier):
Page No: 275-287
Country: -, -, - .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002883

Print This Page

Current Call For Paper

Jetir RMS