UGC Approved Journal no 63975(19)

ISSN: 2349-5162 | ESTD Year : 2014
Call for Paper
Volume 11 | Issue 4 | April 2024

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 5 Issue 11
November-2018
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIRK006126


Registration ID:
188125

Page Number

833-838

Share This Article


Jetir RMS

Title

A Critical Literature Review on Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Method

Abstract

The decision of delivery technique is a standout amongst the most vital choices that can decide the nature of development ventures. Two fundamental conveyance techniques, outline offer develop and configuration construct have been analyzed as far as task quality; still, a critical quality measurement, execution quality, has for the most part been pushed aside in past reviews. In this examination, the creators utilized existing financial hypotheses to build up a model to look at people in general introduction, quality and undertaking benefits of these two conveyance techniques. The balance purposes of the model were examined with thought given to impacting variables, for example, cost coefficient, collaboration proficiency, and coordination cost. Four propositions were made to encourage the quality-benefit correlations between configuration offers develop and configuration fabricate. The principal recommendation demonstrated that to augment individual benefit, the venture organizer ought to dependably hold a harmony between plan, quality and building quality, regardless of the conveyance strategy. The other three recommendations demonstrated that the two techniques can create moderately higher evaluations of execution, quality and venture benefits in a proper undertaking condition. Established on these propositions, the creators put the execution, quality and benefits of the two techniques inside various conditions and used a considerable undertaking to show the down to earth estimation of these conclusions. Through contextual investigation, participation, productivity was distinguished as the most basic component that impacts the determination of conveyance strategy. In increment, three key advances were outlined to encourage the use of the model began in this work.

Key Words

Design-bid-build; Design-build, Economic theories, Performance quality, Project profits, Quality-profit equilibrium points, Contracting

Cite This Article

"A Critical Literature Review on Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Method", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.5, Issue 11, page no.833-838, November-2018, Available :http://www.jetir.org/papers/JETIRK006126.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"A Critical Literature Review on Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Method", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.5, Issue 11, page no. pp833-838, November-2018, Available at : http://www.jetir.org/papers/JETIRK006126.pdf

Publication Details

Published Paper ID: JETIRK006126
Registration ID: 188125
Published In: Volume 5 | Issue 11 | Year November-2018
DOI (Digital Object Identifier):
Page No: 833-838
Country: Vallabh Vidyanagar, Anand, Gujarat, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0002972

Print This Page

Current Call For Paper

Jetir RMS