UGC Approved Journal no 63975(19)
New UGC Peer-Reviewed Rules

ISSN: 2349-5162 | ESTD Year : 2014
Volume 13 | Issue 2 | February 2026

JETIREXPLORE- Search Thousands of research papers



WhatsApp Contact
Click Here

Published in:

Volume 13 Issue 2
February-2026
eISSN: 2349-5162

UGC and ISSN approved 7.95 impact factor UGC Approved Journal no 63975

7.95 impact factor calculated by Google scholar

Unique Identifier

Published Paper ID:
JETIR2602077


Registration ID:
575209

Page Number

a546-a565

Share This Article


Jetir RMS

Title

TECHNO-COMMERCIAL STUDY OF ‘TUNNEL FORMWORK SYSTEM’ AND ITS COMPARISON WITH CONVENTIONAL AND ALUMINUM FORMWORK SYSTEMS.

Abstract

Construction industry of India is growing tremendously. Multinational construction companies came to Indian market made the globalisation, it’s now the need of time to faster and precise in construction in India. Traditional methods of construction are incapable to meet the desired speed, quality and economy of the construction. Though the traditional construction methods are convenient but unable to deliver the required housing units in desired time with desired quality, hence there is need to adopt the advanced construction technichqs available in the market as well as develop the existing techniques. Construction is a complicated and tedious job which required exhaustive planning, monitoring, resource planning and strong cash flow. On executing all these activities hand in hand the project will be completed successfully, failure of any activity will result the overall failure of the project. In construction formwork plays a vital role and its cost is around 20 to 24% of the overall cost of the project. The desired quality, speed and economy of the project can be achieved by means of meticulous planning. To avoid the damage to the permanent structure to be constructed utmost care to be taken of formwork need to be taken. By using the tunnel formwork the contractor can cast the slabs and walls together at same time in per day cycle alongwith quality, speed, precision and ultimately the economy. In this dissertation the will be studied in detail, and, Aluminium Formwork (Mivan Technology) with Tunnel Formwork System.

Key Words

Tunnel Formworks

Cite This Article

"TECHNO-COMMERCIAL STUDY OF ‘TUNNEL FORMWORK SYSTEM’ AND ITS COMPARISON WITH CONVENTIONAL AND ALUMINUM FORMWORK SYSTEMS.", International Journal of Emerging Technologies and Innovative Research (www.jetir.org), ISSN:2349-5162, Vol.13, Issue 2, page no.a546-a565, February-2026, Available :http://www.jetir.org/papers/JETIR2602077.pdf

ISSN


2349-5162 | Impact Factor 7.95 Calculate by Google Scholar

An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 7.95 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator

Cite This Article

"TECHNO-COMMERCIAL STUDY OF ‘TUNNEL FORMWORK SYSTEM’ AND ITS COMPARISON WITH CONVENTIONAL AND ALUMINUM FORMWORK SYSTEMS.", International Journal of Emerging Technologies and Innovative Research (www.jetir.org | UGC and issn Approved), ISSN:2349-5162, Vol.13, Issue 2, page no. ppa546-a565, February-2026, Available at : http://www.jetir.org/papers/JETIR2602077.pdf

Publication Details

Published Paper ID: JETIR2602077
Registration ID: 575209
Published In: Volume 13 | Issue 2 | Year February-2026
DOI (Digital Object Identifier):
Page No: a546-a565
Country: Kolhapur, Maharashtra, India .
Area: Engineering
ISSN Number: 2349-5162
Publisher: IJ Publication


Preview This Article


Downlaod

Click here for Article Preview

Download PDF

Downloads

0004

Print This Page

Current Call For Paper

Jetir RMS